Where appropriate the District may
utilize a design-build method for construction of a specific project. Under
this method of construction, a construction entity provides architectural,
engineering, labor, material, supplies and equipment related to the
construction itself. If the Board
chooses a design-build method, the procedures of Regulation 7131 shall be
followed.
*****